The project involved extending Runway 10-28 at Gaspé Airport, rehabilitating the existing pavement, and upgrading visual aids to enhance the safety and reliability of air operations.

The runway extension, combined with the installation of a precision approach, significantly reduced flight cancellations, increasing the landing success rate from 85% to 98%. This improvement ensures continued air service even under adverse weather conditions.

The mandate included the 304-metre westward extension of the runway, upgrades to wind indicators, pavement markings, lighting, and signage, rehabilitation of the existing runway surface, taxiway, and apron, as well as various maintenance works such as grading at runway edges and catch basin head repairs.

Project Features and Complexity

The project presented several challenges:

  • Meeting a tight schedule for plans and specifications with limited local resources (laboratory and survey)
  • Strict quality control using only a single local asphalt supplier
  • Adhering to the three-week runway closure timeline for construction activities

To optimize execution, the project used drone (LIDAR) surveys, and on-site fill material was reused for the runway extension, reducing costs and ensuring uniform behavior of the surrounding fill area.