Québec City Tramway
Québec City Tramway
2021
Municipal

As part of the development of Québec City’s new structured public transit network, gbi was mandated to carry out an in-depth material characterization study for several buildings located along the future tramway route. This essential mandate supports the safe planning of demolitions and ensures responsible management of identified contaminants.
Drawing on its expertise in industrial hygiene and environmental services, gbi provides :
- A complete characterization report for each analyzed building
- A detailed inventory of identified hazardous materials (asbestos, lead, mercury, PCBs)
- A rigorous budget assessment for demolition work based on the contaminants detected
These services provide a clear and reliable understanding of the environmental issues associated with the targeted buildings, supporting the safe and efficient deployment of the tramway project.
Methodological Approach
gbi’s approach stands out for its careful planning and proven methodology :
- Coordination of site visits with occupants and planning of sampling campaigns
- Analysis of existing studies and development of a tailored sampling strategy
- Provision of specialized equipment and execution of comprehensive field surveys
- Accurate characterization of the buildings and infrastructure involved
This approach ensures exhaustive data collection in full compliance with applicable standards.

Mandate Objective
The mandate aims to identify and document materials that may contain :
- PCBs
- Asbestos (MSCA)
- Lead (MSCP)
- Mercury
Project Complexity and Notable Features
This mandate stands out due to the scope of analyses required and the diversity of the buildings assessed. Key elements highlighting this complexity include :
- Campaigns conducted in 25 buildings with varied uses (commercial, residential, institutional), often while occupied
- Characterization of multiple contaminants, including asbestos, lead, and various hazardous materials
- Preparation of detailed records for each building
- Cost estimation for demolition work considering the identified contaminants
Ces particularités démontrent la capacité de gbi à gérer des projets multidisciplinaires exigeants, où rigueur, coordination et expertise technique sont essentielles.